2002 Seminar 1

Nuclear Installation Safety / Assessment and Analysis

AttachmentSize
Neutron Fluence at the Reactor Pressure Vessel Wall - a Comparision of French and German Procedures and Strategies in PWRs (U. Jendrich (GRS), N. Tricot (IRSN))48.21 KB
Insights and Lessons Learned from the Brunsbüttel Piping Failure Event (H. Schulz, A. Voswinkel, H. Reck (GRS))32.65 KB
Neutron Flux Oscillations at German BWRs (M. Maqua, K. Ktthoff, W. Pointner (GRS))387.97 KB
Fire-induced Damage to Electrical Cables and Fire Growth on Cables (O. Keski-RahKnen, J. Mangs (VTT, Finland), R. Bertrand (IRSN), M. Röwekamp (GRS))263.96 KB
French experiences on Renewing of I&C Systems in NPPs - Feedback from assessing nuclear instrumentation system (RPN) refurbishment at French CP0-series plants (F. Fradet, J. C. Péron, B. Soubies, O. Elsensohn (IRSN))49.65 KB
IAEA Extrabudgetary Programme on Mitigation of Intergranular Stress Corrosion Cracking in RBMK Reactors (R. Havel (IAEA))34.77 KB
Potential Risk of a Criticality Event During Refuelling (V. Laurioux, P. Deschamps (IRSN))331.58 KB
Upgrading of the Ukrainian NPPs, the "2+2" Approach Applied for the Licensing of the Major Modifications (A. Gorbatchev, D. Goetsch (IRSN), P. Kelm (GRS), V. Redko (SNRCU, Ukraine), N. Martirossian (ANRA, Armenia), A. Madonna (ANPA, Italy))48.91 KB
Safety Reassessment of the Old Installations Involved in Fuel Cycle (M. Guillard (IRSN))33.27 KB
Regulations and Equipment Qualification Programme for Increased Operating Safety at Ignalina NPP (A. Alejev (VATESI, Lithuania), M. Chouha (IRSN), G. A. Georgiou (Jacobi Consulting Ltd - UK), R. Shipp (Firecrest Consulting Ltd - UK)45.03 KB