• Imprint
  • Sitemap
Eurosafe
    • Home
    • EUROSAFE Approach
    • Previous Forums
    • EUROSAFE Tribune
    • Links
    • Contact Us

Previous EUROSAFE Forums

  • EUROSAFE 2008
  • EUROSAFE 2007
  • EUROSAFE 2006
  • EUROSAFE 2005
  • EUROSAFE 2004
    • Panel Lectures
    • Seminar 1
      • Posters
    • Seminar 2
    • Seminar 3
    • Seminar 4
    • Seminar 5
  • EUROSAFE 2003
  • EUROSAFE 2002
  • EUROSAFE 2001
  • EUROSAFE 2000
  • EUROSAFE 1999

2004 Seminar 1

Nuclear Installation Safety - Assessment and Analysis

AttachmentSize
Experience with the influence of both high summer air and cooling water temperatures and low river levels on the safety and availability of German and French NPP (Thuma, J. Rodriguez, F. Bigot, Y. Guigueno)149.71 KB
Current developments with respect to safety management in German NPPs (H. Nitschke, K. Kotthoff, S. Oltmanns, W. Schwarz, C. Verstegen )126.61 KB
Treatment of generic anomalies affecting the safety of French NPP An example : non-compliance of K1-qualified electrical connections (P. Clairay, T. Provost)172.16 KB
International Review of Kursk Unit 1 In Depth Safety Analysis Report (Michel Chouha, Leonid Bolshov, Phil Butcher, Rolf Janke, Tony Parsons, Jochen Peter Weber)145.76 KB
Experience with maintenance and periodic tests in German NPPs and the influence on safety (C. Franz)86.65 KB
Systematisation of the use of experience feedback from NPP's in the regulatory field (A. Vandewalle)94.44 KB
TSO support to the State Nuclear Regulatory Committee of Ukraine in the licensing of Rovno 4 and Khmelnitsky 2 NPP units (K2R4) (A. Gorbatchev, H. Teske, H. Zabka, O. Zelenyi)151.95 KB
Lessons Learnt from the Resin Release into the Primary Circuit of the Fessenheim NPP Unit 1 in January 2004 – Impact on the Nuclear Safety (M. Georgescu )367.79 KB
Comparison exercise of probabilistic precursor analysis (V. Fauchille, S. Babst)92.18 KB
  • 1+[encrypted]+#b94+
Copyright © 2008 Eurosafe-forum.org