| Experience with the influence of both high summer air and cooling water temperatures and low river levels on the safety and availability of German and French NPP (Thuma, J. Rodriguez, F. Bigot, Y. Guigueno) | 149.71 KB |
| Current developments with respect to safety management in German NPPs (H. Nitschke, K. Kotthoff, S. Oltmanns, W. Schwarz, C. Verstegen ) | 126.61 KB |
| Treatment of generic anomalies affecting the safety of French NPP An example : non-compliance of K1-qualified electrical connections (P. Clairay, T. Provost) | 172.16 KB |
| International Review of Kursk Unit 1 In Depth Safety Analysis Report (Michel Chouha, Leonid Bolshov, Phil Butcher, Rolf Janke, Tony Parsons, Jochen Peter Weber) | 145.76 KB |
| Experience with maintenance and periodic tests in German NPPs and the influence on safety (C. Franz) | 86.65 KB |
| Systematisation of the use of experience feedback from NPP's in the regulatory field (A. Vandewalle) | 94.44 KB |
| TSO support to the State Nuclear Regulatory Committee of Ukraine in the licensing of Rovno 4 and Khmelnitsky 2 NPP units (K2R4) (A. Gorbatchev, H. Teske, H. Zabka, O. Zelenyi) | 151.95 KB |
| Lessons Learnt from the Resin Release into the Primary Circuit of the Fessenheim NPP Unit 1 in January 2004 – Impact on the Nuclear Safety (M. Georgescu ) | 367.79 KB |
| Comparison exercise of probabilistic precursor analysis (V. Fauchille, S. Babst) | 92.18 KB |