| AVN’s experience as TSO in safety assessments of steam-generator-replacement and power-uprate projects (M. Vincke, D. Gryffroy, N. Hollasky, G. Roussel (AVN)) | 37.78 KB |
| The technico-economic optimization of the improvement of the safety level of the PWR 900 MWe units for their third ten-yearly outage thanks to the cost - benefit analysis (A. Dubreuil-Chambardel (EDF/SEPTEN, France), J.-P. Roux (EDF/DPN, France), N. Gimet | 21.15 KB |
| Safety Improvements gained by taking into Account Fluid Structure Interaction when calculating Loads due to the Propagating Pressure waves in Pipe Systems (J. Perlia (TÜV-Süd, Germany)) | 4.56 MB |
| Support of the Russian Nuclear Safety Authority (Rostechnadzor) in developing the regulatory basis for dealing with ex-weapons plutonium (J.-P. Carreton (IRSN), N. Hollasky (AVN), B. Gmal (GRS), A. Petry (RISKAUDIT) with collaboration of: S. Pilate (EC), | 30.83 KB |
| Assessment of safety-critical software (J. Gassino, J.-C. Peron, P. Régnier, B. Soubies (IRSN)) | 55.73 KB |
| Generic issues on sump clogging (W. Pointner, E. Kersting, B. Pütter (GRS)) | 235.03 KB |
| Periodic Safety Review: modifications resulting from the second ten-yearly outages of the French 1300 MWe PWRs (I. Miramon (IRSN)) | 98.88 KB |
| Key Issues in Safety Assessment of Digital I&C Upgrades in Eastern type NPP’s (10 years of German-Ukrainian collaboration) G. Schnuerer (GRS), M.Yastrebenetsky (SSTC, Ukraine), A. Lindner (GRS) | 86.68 KB |
| Safety evaluation of the Finnish EPR project (J. Hyvärinen, P. Tiippana (STUK, Finland)) | 19.28 KB |